The problem of Scheduling $n$ Independent Jobs
on $m$ Unrelated Parallel Machines, when $m$
is fixed, is considered. The standard problem
of minimizing the makespan of the schedule
(SUM) and the bicriteria problem of scheduling
with bounded makespan and cost (SUMC), are
addressed, and randomized fully linear time
more >>>